Predictability & Time Savings

All our projects use two construction sites: the field and the factory, operating simultaneously, with the factory capable of 24/7 operation.


Consequently, our buildings can be constructed in less than half the normal time, construction financing costs and general conditions are more than halved, and quality control is much easier to maintain.